I'm looking for some help to figure out if this senario meets code:
Customer has two stand-alone buildings on their propery. Each building is normally fed by it's own utility transformer and has it's own MP and meter. Building A will have the two independant PV systems installed on it. PV system 1 will feed building A and system 2 will feed building B with 120/240VAC, which is 600 feet away through an UG conduit into that MP and meter.
Customer has two stand-alone buildings on their propery. Each building is normally fed by it's own utility transformer and has it's own MP and meter. Building A will have the two independant PV systems installed on it. PV system 1 will feed building A and system 2 will feed building B with 120/240VAC, which is 600 feet away through an UG conduit into that MP and meter.