Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
So I have 4 workers trailers that need to be wired. The have 60A MCB panel.
WOuld you bring a seprate 60A feed to each one or run out larger feed and splice down? But then if your circuit breaker or switch trips then all the trailers go down. Thanks.
WOuld you bring a seprate 60A feed to each one or run out larger feed and splice down? But then if your circuit breaker or switch trips then all the trailers go down. Thanks.