Can't get the other pictures to do right now, but in the picture I did post, I realize that pvc has to be secured in 3ft. intervals. Looks like the only way would be to run 45's around each post then up at the points where the lights go. I also have to run 2 switch legs and one hot wire all the way to the dock for lights under the canopy, and 2 beacons on top of the canopy. They have 3 receptacles on post under the canopy. I know that all has to be GFCI protected. The other picture is of the ramp that goes from the walkway to the dock. I realize that I must use flexible conduit for rise and fall of the water, and that it has to be bonded to the electrical system ground.
I'm still working on the other pictures.