I am installing a 1200 amp GFP/MB 277/480 service disconnect in a new school. This feeds a 1200 amp MDP which is located in the same room.
The electrical engineer is asking for all grounding and bonding to be taken to the MDP and not the service disconnect.
Is this correct?
First question, so be easy on me.
The electrical engineer is asking for all grounding and bonding to be taken to the MDP and not the service disconnect.
Is this correct?