enireh
Senior Member
- Location
- Canyon Lake,TX
I'm doing a 320 amp service for PEC feeding a 125 amp, and a 200 amp panel. They are telling me its ok to do my split bolt connections in the meter can. Load side will have 350 mcm downsizing to #1 copper for the 125 and 2/o copper for the 200. I would think a gutter is needed. PEC likes to instruct us on what they want and at the same time saying it has to comply with the NEC