I guess there are multiple parts to my question.

Looking to make it easier on the electricians and design the pad in order to limit the conduits in and out of the pad. There was a lot of difficulty for them cutting and entering the bottom of recombiner boxes with 8 3" Conduits.

#1 Can MC cable enter a Recombiner Box without Conduit?
#2 Where can I find the section about Utilidor/Trench Code in the NEC? Looking to possibly pour the slab with trenches in it for easy access and potential repair/replacement down the line.