Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
I know this has been discussed before but there seems to be varying opinions and I'm bidding a job with a lot of sets. I'm only running empty conduits and MC cable. Average run is abut 400'. There has to be reduction in labor time needed compared to if I were running much fewer sets.
My point I think I could possibly reduce my labor unit for the conduit if installing (10) sets compared to (2 sets).
(10) sets of 4" EMT
(5) sets of 4" EMT
(8) sets of 4" EMT
(12) sets of 4" EMT
(7) sets of 4" EMT
(6) sets of 4" EMT
(4) sets of 4" EMT
(3) sets of 4" EMT
(28) sets of 4/C #500 MC cable
My point I think I could possibly reduce my labor unit for the conduit if installing (10) sets compared to (2 sets).
(10) sets of 4" EMT
(5) sets of 4" EMT
(8) sets of 4" EMT
(12) sets of 4" EMT
(7) sets of 4" EMT
(6) sets of 4" EMT
(4) sets of 4" EMT
(3) sets of 4" EMT
(28) sets of 4/C #500 MC cable