Hey all,
Was curious if anyone had experience with buildings consisting of multiple electrical services and the PV interconnection. My question is if there are 2 services can the PV system be split into 2 and have half connected to each service or would all PV need to go back to a single point of interconnection (at 1 service only) for the entire building. Thanks for the insight!
Was curious if anyone had experience with buildings consisting of multiple electrical services and the PV interconnection. My question is if there are 2 services can the PV system be split into 2 and have half connected to each service or would all PV need to go back to a single point of interconnection (at 1 service only) for the entire building. Thanks for the insight!