Long service run

Status
Not open for further replies.

cesenergy

Member
Can anyone help me I have a 575 foot underground Service 200Amp 120/240V Single phase I ran a 4" PVC in a trench from the Transformer to the House and will be insrtalling a meter pedastal by the transformer so the 575 ft is all secondary I was going to run 250 Aluminum XHHW for voltage drop do you think this is overkill? I tried to talk the customer into Primary but he refused and the utility is allowing him to go all secondary. Somehow he feels this is cheaper considering he would be paying for another transformer to be placed anyway does anyone think I may be undersizing it or over killing it voltage drop,voltage drop ouch
 