TAPandSons
Member
- Location
- Arizona
- Occupation
- Electrical
We have installed a 3 inch round 10 foot aluminum post with an all in one solar head on top. No wires. All self contained. The city is requiring us to install a ground rod and lug it to the pole at each pole. They also want an electrical engineer stamp. No engineer will stamp it they said it's not required. And after watching Mikes video he discourages the rod. Can I get some feed back on this. Thanks.