I can't find any reference to this in the NEC, Mechanical or fire codes.
If there is a change in tenancy (No TIs) and a customer wants to add some Voice/Data Drops, is the existing PVC cable grandfathered in as acceptable for reuse? This is a standard office with drop ceilings that would require new wire to be plenum rated. Is there anything in any code (relevant in May/June 2002) that would require removal of existing cable?
Thank you for your comments.
Thank you for your comments.
If there is a change in tenancy (No TIs) and a customer wants to add some Voice/Data Drops, is the existing PVC cable grandfathered in as acceptable for reuse? This is a standard office with drop ceilings that would require new wire to be plenum rated. Is there anything in any code (relevant in May/June 2002) that would require removal of existing cable?
Thank you for your comments.
Thank you for your comments.