Does the emergency feed to a fire pump from a generator need to be concrete encased if it is going through parts of the building to get from the Generator location(indoors) to the fire pump room?
695.6(a) says SUPPLY conductors. Does SUPPLY conductors include the feed from the generator? The wording for this section sounds like it is talking about services and not generators. There is a note about only the Normal ones needing it when in a campus arragement, but campus is not the case for this project.
695.6(a) says SUPPLY conductors. Does SUPPLY conductors include the feed from the generator? The wording for this section sounds like it is talking about services and not generators. There is a note about only the Normal ones needing it when in a campus arragement, but campus is not the case for this project.