I am looking at a small job that is all in 3/4 conduit. Metal studs around a 100'x 50' building. Conv. outlets are just Metal bracket boxes screwed to the studs, conduit, ect. Does anybody have a good idea what a standard length of time most folks bid work like this at? I am just wanting to get a number for the conduit installation, not the wire pulling. I know what a am going to bid ( I am doing it myself ) but what is a good number for labor if you are having a JW do it? Nothing tech. about the job, home runs will be a little challenging as they have to run up in the wooden rafters, but as far as a hard fast rule, does anybody know what the estimation programs spit out when you calculate the length of the conduit run? After I find out the numbers on the bids, I want to dissect the numbers and see whats shaken with everyone. Also, I have many stub ups for the Com. 411/16 box, 1" emt stubbed up through the metal plate and a 12" 90 with plastic bushing on it. Ceiling height is 10'
Thanks!
Thanks!