Shujinko
Senior Member
I have a project that will use directional boring to install some conduits on the secondary side of a utility transformer. Basically the electrical conduits routed from the utility transformer, under a concrete courtyard, to the building main electrical room. I am not too familiar with this directional boring technique. Does anyone have a website or info on how this is done? What are the limitations (pro's and cons) to this technique?