NEC Table 300.5 - Non metalic race ways under a building, we didn't get local inspection. We have compaction tests, we have pictures, and we have engineer field reports before the slab was poured. The local inspector wanted to see the pipes before we back filled we didn't call. We poured the slab so any help short of digging up the slab would be appreciated. We know that we made a mistake but at this point we just need any suggestions.
Thank You!