I have a 480v panel feeding 2 208v panels thru 2 separate transformers the 208 panels are side by side and in a very tight spot, so the easiest thing for me to do is to put a 3'x8"x8" gutter above both of the panels. what i'm trying to do is run the 2 feeder conduits to the gutter and then in to the panels plus the branch circuits conduits to do the same so that i can just use it as a pull box but i'm not sure if i'm breaking any code rules.
hope somebody can take me in the right path.