bobbymari
Senior Member
- Location
- los angeles ca
Question regarding fed through panels. We are rehabbing an apartment building in which upper units subfeeds are fed through lower units subs. Not the way we do things but in this case it would save a ton of work as conduits are properly sized to keep it the same. We are swapping subpanels and upsizing feeders and as mentioned prior conduits are still adequate. Is there anything preventing us from using the feed through method if upper feeds are unspliced feeding directly through lower subs. Thanks in advance