A 705.12 question: Load side connection to the MSP without PV breaker?

Status
Not open for further replies.

fandi

Senior Member
Location
Los Angeles
How are they tapping the bus, and can that be done at the end of the bus? The breaker vs tap is not really an issue. And as I commented earlier, they could tap the feeder supplied by one of the breakers at one end of the bus.

But the above is about how to improve the design, not about establishing that the current design is insufficient.

Cheers, Wayne
I myself have a hard time wonder why the tap was made not at the end of the bus. I'll try to talk to him.
 