2.0 MVA open core transformer clear space requirements

Status
Not open for further replies.

kenaslan

Senior Member
Location
Billings MT
I am designing a vault for a 27.6KV 2.0 MVA open core transformer. It looks like in table 56 that a min clearance of 2.5M is required around this transformer. Can someone please let me know if this is correct. What about the MV SWGR? Is only 1M required or the 2.5M for working clearance?
 