Greetings fellas,
Does an entire MCC needs to be de-energized when adding a new load to a 120V panel(sub-panel) located in MCC lineup? Or is opening the mains in the said panel would be sufficient. Since routing of cabling is involved from the sub-panel out to the load, it appears for the sake of safety outage would need to be scheduled.
Am I on the right track with this?
Thanks,
EE
Does an entire MCC needs to be de-energized when adding a new load to a 120V panel(sub-panel) located in MCC lineup? Or is opening the mains in the said panel would be sufficient. Since routing of cabling is involved from the sub-panel out to the load, it appears for the sake of safety outage would need to be scheduled.
Am I on the right track with this?
Thanks,
EE