3oFElectric
Member
- Location
- Tennessee
- Occupation
- Electrician
If I've got Schedule 40 PVC conduit stubbing up through 4" of concrete slab in single family dwelling, would I be required to trench 12" below the slab per Table 300.5, Column 3, Line 2 even though slab is 4" rather than 2" thick?