Between arrays if it is 20 ft or less of exposed conduit on roof do I need rapid shut down. I have sunny boy rapid shut down between inverter and first array. I think between arrays it is 20 feet Inspector thinks i need RSD between arrays cause it’s more then 10. I think 10 feet each array Equals 20 feet