I've heard Mike say that codes will be made that can't be complied with at that time but the code panel puts it in to trigger the manufacturer's to produce the products. In those cases if the product doesn't exist you simply refer to the previous code cycle. But where is that rule written? I've also heard Mike say that there is nothing wrong with running a transformer backwards as long as the bonding jumper is installed on the proper side. I have an inspector who will not approve this even though I have a letter from Hamman (manufacture). Please Help