Thank you, guys.Originally posted by charlie:
You need to check on the size also. We require 6" Galvanized pipe or conduit, 7' long set 3' deep in concrete and filled with concrete. These posts are to be set 1' off the corners of the pad in both directions away from the corners of the pad to allow full access to the transformer which will be smaller than the pad. Check out the drawings in our Goldbook.