Pscanlin
Member
- Location
- Houston, Texas
- Occupation
- Electrical Designer
This TDU out of San Antonio TX. requires taps to be in a "tap box". the layout goes, rev. meter -tap box - pv meter. because of limitations on space available to hang our electrical panels. are there codes on the allowable distance between tap box and main service panel?