Good morning all,
Question : When installing a sub panel in a outbuilding that will be fed from the house main service panel can three wires (L, L, N) be run to the subpanel with the use of ground rods at the outbuilding location ? Also, does there need to be a main in the sub panel because it is in a separate structure and does that main have to match the amp rating of the OCPD in the main service panel in the home
Thank you
Question : When installing a sub panel in a outbuilding that will be fed from the house main service panel can three wires (L, L, N) be run to the subpanel with the use of ground rods at the outbuilding location ? Also, does there need to be a main in the sub panel because it is in a separate structure and does that main have to match the amp rating of the OCPD in the main service panel in the home