this is specifically for a single phase application. Other than upping the wire size, what other things can we do to account for voltage drop when running long runs underground?
Ex. We need to run feeders approx 800’ underground to a separate building.Customer wants a 100A MLO panel installed.
If I wanted to have these feeders running off a 100A breaker, what can I do other than up the wire size?
Ex. We need to run feeders approx 800’ underground to a separate building.Customer wants a 100A MLO panel installed.