I have client that owns a small building that was originally two suites. He is interested in having a standby generator installed, as we are in Ca and will be having intermittent power outage for the next 5-10yrs. The building has single service drop that goes into a gutter then to two utility owned meters.
One panel being 125a and the second 100a. This is single phase 120/240. I plan to install a 22kw generator but I am not to sure how to go about powering both panels with the single generator. Hoping someone can give me a little advice or point me in the right direction.
Do they make transfer switches for this type of scenario?
Thanks