opinions? parallel 1/0 or 300 copper

Status
Not open for further replies.

wyreman

Senior Member
Location
SF CA USA
Occupation
electrical contractor
Begin. To begin is half the work, let half still remain; again begin this and thou wilt have finished. - Ausonius
 

LarryFine

Master Electrician Electric Contractor Richmond VA
Location
Henrico County, VA
Occupation
Electrical Contractor
Begin. To begin is half the work, let half still remain; again begin this and thou wilt have finished. - Ausonius
"Words like 'refinish.' 'What’re you doing?' 'Refinishing a table.' Don’t you have to restart? You should." ~ George Carlin ;)
 

JoeyD74

Senior Member
Location
Boston MA
Occupation
Electrical contractor
Hard to see it in the picture but why not just go strait up above the next window and eliminate the last 90?
 

wyreman

Senior Member
Location
SF CA USA
Occupation
electrical contractor
Closed out this job and it was a case of
the dog that didn't bark.

Wires slid right down the 2" pipe.
all good! thanks guys =)
 

wyreman

Senior Member
Location
SF CA USA
Occupation
electrical contractor
300, 300, 2/0
built a platform and hoisted up the service pipe with a simple pulley
brought the wire down from the window above
the lube was hardly necessary


I do believe that building anything in your imagination first is very useful
Screen Shot 2020-11-11 at 11.47.54 AM.png
 

flashlight

Senior Member
Location
NY, NY
Occupation
Electrician, semi-retired
Well, that's great ! I got to the end of the thread and deleted what I was about to post, which had to do with maybe using 2 1/2 in pipe....
 
Status
Not open for further replies.
Top