Ive been asked to calculate the total load of a laundry mat we are going to be doing. the service is 120/208 3-phase, and I have all of the loads for the equipment, lighting, and hvac.
do I just add the full load draws for the 3-phase equipment, and for the single phase loads do I add, then divide by 3? Also for the hvac I just need the larger of the heating or cooling?
and for convienece recepts it is 180 va?
any suggestions would be helpfull, thanks.
do I just add the full load draws for the 3-phase equipment, and for the single phase loads do I add, then divide by 3? Also for the hvac I just need the larger of the heating or cooling?
and for convienece recepts it is 180 va?
any suggestions would be helpfull, thanks.