I have a contractor that is wanting to use Art. 230.7 & 312.8 to leave meter base with unfused service entrance conductors and feed through a sub-panel to get to the new ATS. My question is on protected (fused) and unprotected wire and feeding through the sub-panel. Do either one of these articles allow this.