bulldog
Member
- Location
- New Jersey
I have looked at a job. It has a main 200 amp 3 phase meter. There is a 100 amp 3 phase disconect after the meter. This feeds 5 meters that each feed an apt.The panels off these meters are they main panel or subpanels?