I have conflicting arguments between a couple of electricians and I wanted to know the real story. The situation is: 4 parallel runs of 350's from the weatherhead to a CT cabinet, out to a Fusible Disconnect, then the 4 runs from the load side out to Panel we'll call MDP. 1200 amp fuses in Disconnect- we are running an oversized #2 for supplemental ground rods, what size grounding electrode conductor should we have to the Water main? Also, what size equipment grounding conductors are needed in each pipe?