I have been callec to investigate an issue with pitted water pipes.$15,000 dollars worth of plumbing repairs.3 seperate apt. buildings each with a 3ph 4w 400a service 1 4" water main feeds all three buildings.There is no ground wire run to the 4" where it enters the building,yet at each service there is a #8 solid run to a ground rod and a 1/0 run to the nearest 2" cold water pipe.Should all 3 service ground conductors be tapped together and run to the 4" main and could the grounding and bonding structure be effecting the copper tubing?