We just lost a good size job with a warehouse lighting project. We were going to install Unistrut across the bar joist for fixture support and centering of the fixtures in the aisles. The other contractor hung the fixtures on chain supported by a 1/2 inch minnie sheet metal screwed to the roof decking. Doesn't the code prevent anything being fastened or installed above the top of the bar joist?