Hello,
Looking for input on the cables being used to monitor the system most time to scan loads in main panel and run to the combiner to be send remotely.
Seeking justification if it can/can't use the same raceway as the PV feed back to the main panel.
Please, no personal opinion, only information that can be backed up in the 2017 NEC.
Thanks,
Looking for input on the cables being used to monitor the system most time to scan loads in main panel and run to the combiner to be send remotely.
Seeking justification if it can/can't use the same raceway as the PV feed back to the main panel.
Please, no personal opinion, only information that can be backed up in the 2017 NEC.
Thanks,