Bonding spare metallic conduits stubbed up in building s

Status
Not open for further replies.

jnh

Member
Does the code require you to provide grounding bushings and bonding jumpers on spare metallic conduits that are stubbed-up in the building slab and capped for future use? Also, does this same scenario apply to spare metallic conduits that are stubbed-up and capped in equipment enclosures as well?
 