Dylan883
Member
- Location
- Pennsylvania
- Occupation
- Industrial electrician
So most work I do is 3 phase and all industrial I do some residential have done upgrades before and this one is for my self and want to make sure everything is good few people I have talked with believe it's okay but would like other more experienced residential electricians thoughts. So upgrading to 200 amp service after meter going into a 200 amp whole house auto transfer switch it just has a 200 amp breaker so this is my first means of disconnect everything after will be 4 wire coming out it is also mounted exterior of house then going into house basement into splice box where polaris connector used to splice 4/0 to 4/0 so wire can continue through basement to underground to garage all in conduit and 200 amp panel with breaker in garage now back up to splice box also coming out of there to the house panel 10ft away no need for 200 amp in house it's all gas so would like 100amp the wire from splice box to 100amp panel would be 2 gauge that wire would never see 100 amps because of breaker in panel but my concern is it against code cause it's all feed from a 200amp breaker? Also out of 100amp panel will be a 50 panel to barn and no generator yet that's in future.