I have a situation i do not understand.
I would like to tie in a (N) 2p50A PV breaker.
However the 100 AMP fused and rated, main switch is on the UTILITY side of all the meters.
The conductors then feed five meters in individual enclosures. The fifth meter is the relevant meter.
It feeds a MLO, 125 A rated panel, that has 9 breakers.....
6 of these feed 6 individual apt. units.
Is this a subpanel? OR MSP?
How does the 120% rule apply vis a vis the 100 A switch which is on the UTILITY side of the meter???
What are constructive suggestions to tie into such an existing scenario?
or
What would you replace, rewire etc to make it easy to add solar , and Code compliant?
I would like to tie in a (N) 2p50A PV breaker.
However the 100 AMP fused and rated, main switch is on the UTILITY side of all the meters.
The conductors then feed five meters in individual enclosures. The fifth meter is the relevant meter.
It feeds a MLO, 125 A rated panel, that has 9 breakers.....
6 of these feed 6 individual apt. units.
Is this a subpanel? OR MSP?
How does the 120% rule apply vis a vis the 100 A switch which is on the UTILITY side of the meter???
What are constructive suggestions to tie into such an existing scenario?
or
What would you replace, rewire etc to make it easy to add solar , and Code compliant?
Last edited: