I have a customer who wants to add another extraction well. he currently has six well control panels that need a 20amp single phase 240 to each panel. These panels are being feed from a 50amp two ploe breaker. from this breaker it goes 500 feet underground in a conduit with #4's to a pull box. From this pull box he has spliced on #8's to each of the 6 wells (approx. 100feet).
So my question is, is this tap a code violation?
So my question is, is this tap a code violation?