gbuschling
Member
- Location
- Chesapeake Beach, Md
Installing a residential 12kW standby generator with a 100A ATS/16 circuit load center.
When moving the esential circuits to new panel do associated grounds and neutrals
also have to be transfered? Manufacturers drawing do not show them be moved.
When moving the esential circuits to new panel do associated grounds and neutrals
also have to be transfered? Manufacturers drawing do not show them be moved.