retfam
Member
- Location
- California
On a typical roof mounted photovoltaic system on a home with an existing UFER. After the install, the contractor installed a seperate ground rod. Does the ufer and the ground rod need connected directly to each other? I can see a picture I saw where a house had 2 ground rods and there was a bond wire ran from one to the other. I just have the feeling that this is wrong because it would provide 2 paths to ground.